A wide crack that has grown, under a basement window
Example project
- Home
- House in Bothell with a poured-concrete basement
- Original request
- A crack under a basement window that is wider than it was a year ago
- Crack
- Wider than a pencil line and still visible on the outside face
- First step
- Two measurements, then a decision on what to do
- Not included
- Window repair and repainting
- Cost
- $1,800
Scope of work
Measuring and marking the crack, cleaning it, sealing it as the plan calls for and checking it again after the next wet season. Window work, repainting, an engineer’s design and permit costs are not part of this cost.
Project overview
In this example, the owners of a house in Bothell find a crack under a basement window that looks wider than it did a year ago. It shows on both the inside and the outside of the wall.
A crack that has grown is not simply filled. The plan measures it twice, says whether it needs a closer look before sealing, and notes whether an engineer or a permit comes into it.
The goal
The goal is a crack that has grown, looked at before it is filled, sealed as the plan allows and checked at the next wet season.
Process
- Before work The crack is measured at both ends and in the middle, marked and photographed.
- Decide The plan says whether sealing is enough or whether a closer look is needed first.
- Seal The crack is cleaned and sealed as the plan states.
- Check The marks are read again after the next wet season.
Planning right
- Date a pencil mark at each end of the crack.
- Tell us if the window above has begun to stick.
- Ask whether an engineer or a permit comes into this repair.
- Ask for the readings to be written down.


